Bayer Links



www.invite-research.com/

Winner - Hermes Award 2007

Abwasserbehandlung

BAYER Tower Biology with BAYER Slot Injector Aeration System

Our commitment is based on our tradition and on our long lasting operational experience.
Our typical project steps from problem definition to commissioning are divided in several breakpoints giving the possibility to adjust the project continuously:

  • Laboratory tests and basic plant design (Feasibility Study)
  • (Extended) Basic engineering
  • Detail engineering
  • Delivering of proprietary equipment
  • Project and construction management
  • Cold and hot commisioning
Kontakt
» E-Mail schreiben
+49 (0)214/30-1
News News

21. Januar 2011

Neuerungen bei der thermischen Abluftentsorgung

» Mehr